Commercial structural refurbishment case study

 

Client: BAM Construction

Location: Africa House, Kingsway, Holborn, London

Contractor: Deconstruct UK Ltd

Completion Date: September 2011 

Sector: Commercial structural refurbishment

 

Structural ‘cut and carve’ project at Africa House, Holborn for BAM.

 

 

 

1Africa_houseAfrica_House2Africa_House_3Africa_House_4

 

 

 

 

 

 

 

About the project:

 

Our package of works at Africa House was a major ‘cut and carve’ alteration and demolition contract to a  significant former commercial premises in Holborn central London. This high profile project required substantial temporary works design and installation to transfer temporary loads around occupied ground floor premises of JD Wetherspoon and Ladbrokes. The fast track programme of 22 weeks meant a pro-active design process was key to successful delivery of the project. Deconstruct were very pleased to ensure a safe and timely delivered project.

 

Project challenges:

 

Throughout the works a Wetherspoon Public House remained open on the ground floor along with a trading Ladbrokes. Because of the nature of the temporary works, loads from the structures retained above had to be diverted around occupied areas, along with vibration and noise being controlled to a minimum.

 

Logistics in and out of the site were restricted to a loading compound to the rear, so timely materials management was essential.

 

Download the case study here

 

Our Services:
Deconstruction Services
tick
Demolition Services tick
Enabling Works tick
Asbestos Removal Services tick
Ground Works Services tick
Piling Services tick
Steelwork Installations tick
Builders Works tick
Emergency Dangerous Structures
Temporary Works tick

 

For further information on our Asbestos Removal and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com

 
 
 
 
 
 
Deconstruct UK asbestos removal
Follow us on Facebook Twitter RSS Feed